Connecting a Subdivision or Housing Group to the Drinking Water, Sewerage and Electricity Networks
Machine-translated — the French version prevails.
Procedure for having a subdivision or a housing group connected to the water, sewerage and electricity networks. The work is carried out either by a contractor chosen by the developer, or by the utility distributor.
🏛️ Administration
Water, sewerage and electricity distributor (autonomous public utilities and delegated management companies: Lydec, Redal, Amendis, etc.) (Distributeur d'eau, d'assainissement et d'électricitérégies autonomes et sociétés de gestion déléguée)
💰 CostA final invoice for the infrastructure work (on-site and off-site) is issued at the end of the work, based on the work statement (attachement) and the quantities actually executed, countersigned by both parties.
⏱️ Processing timeCompletion of the connection work: 21 days
📎 Required documents
- Commitment to pay the amount of the quote and the final invoice, and payment of the first instalment
- Rights of way and land crossing rights (motorway, communes, facilities, etc.)
- Copy of the subdivision plans and the boundary certificates relating to the electrical plans, certified by a licensed surveyor (paper and electronic)
- Copy of the building permit for the electrical transformer
- If the work is entrusted to an outside contractor: request for authorization to carry out the work, with the contractor's technical and administrative references
- If the work is entrusted to an outside contractor: 2 copies of the special and technical specifications documents, signed and initialed
- If the work is entrusted to an outside contractor: 2 statements of commitment to comply with the general and special technical specifications documents and the standards in force
- If the work is entrusted to an outside contractor: 2 copies of the work execution file (standard road plans, standard road-crossing plans, network coordination plans, execution schedule)
- If the work is entrusted to the distributor: work contract signed between the client and the distributor (execution deadlines and payment terms)
🧭 Steps
- Submit the request to the distributor with the general documents required (payment commitment, first instalment, rights of way, subdivision plans, transformer permit).
- If the work is entrusted to an outside contractor, submit the authorization request with the contractor's references. The distributor then provides the specifications documents, the network layout, the price schedule and the standard plans.
- Before the work starts, the contractor gives the distributor the signed specifications documents, the commitment statements and the execution file for approval.
- If the work is entrusted to the distributor, sign the work contract with the distributor, which sets the deadlines and payment terms.
- The connection work is carried out.
- At the end of the work, the final invoice is issued on the basis of the work statement (attachement) and the quantities actually executed.
⚖️ Legal references
Dahir No. 1.92.7 of 17 June 1992 (Law No. 25.90 on subdivisions, housing groups and land parceling); Dahir No. 1.92.31 of 17 June 1992 (Law No. 12.90 on urban planning); Decree No. 02-18-577 (June 2019) approving the general building regulations; Joint Orders No. 337.20 and No. 338.20 of 21 January 2020
Other procedures : Housing, real estate and transport
- Certificate of Good Condition of Roads and Utility Networks in a Subdivision
- Obtaining a permit to regularize an illegal construction
- Medium-voltage (HTA) electricity grid connection works
- Challenging a decision of a land registrar
- Obtaining a quote for connection to the medium-voltage (HTA) electricity grid
- Get a quote for an individual connection to water, sewerage and low-voltage electricity
- Drinking water and low-voltage electricity subscription with the utility provider
- Subdivision Permit (Autorisation de lotir)
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.