Drinking water and low-voltage electricity subscription with the utility provider
Machine-translated — the French version prevails.
This procedure lets you sign a subscription contract with the utility provider (public utility board or delegated management company) to get drinking water and low-voltage electricity. The documents required depend on the type of customer: individual, company, association or cooperative.
🏛️ Administration
Autonomous public distribution boards (Régies autonomes de distribution) and delegated management companiesRADEEMA, RADEEF, RADEM, RAK, RADEEJ, RADEES, RADEEL, RAMSA, RADEEO, RADEEC, RADEET, RADEETA, LYDEC, REDAL, AMENDIS
💰 CostAmounts vary by provider: deposit (security deposit), commissioning fee, subscription contract fee and VAT. Details are available on each provider's portal.
⏱️ Processing timeAverage time of 2 days (the page also mentions 4 days).
📎 Required documents
- Individuals: subscription application form completed and signed
- Individuals: copy of the National ID card (CIN), residence permit or passport
- Owner: copy of the proof of ownership (land title, notary's certificate, moulkiya or ownership certificate)
- Tenant: copy of the lease contract, certificate of residence or signed authorization from the owner
- Power of attorney in case of co-heirs, absence of the owner or tenant, co-ownership or shared tenancy
- New electricity connection: copy of the occupancy permit, certificate of compliance or special authorization
- New electricity connection: warranty certificate for the residual-current circuit breakers
- Companies: subscription application signed by the manager or their representative
- Companies: delegation of powers, if applicable
- Companies: copy of the manager's ID document
- Companies: copy of the trade register (registre de commerce) extract
- Companies: copy of the ICE certificate (Common Business Identifier)
- Companies: copy of the articles of association
- Companies: authorization to operate issued by the competent authorities
- Companies: powers and authority of the representatives
- Associations and co-owners' associations (syndicats de copropriétaires): subscription application signed by the president or their representative
- Associations: copy of the president's CIN
- Associations: copy of the general assembly minutes
- Associations: copy of the articles of association or the co-ownership regulations
- Associations: copy of the receipt for the file submitted to the authorities
- Cooperatives: subscription application signed by the president or their representative
- Cooperatives: copy of the articles of association
- Cooperatives: copy of the president's CIN
- Service housing: administrative certificate or allocation decision in place of the proof of ownership and the occupancy permit
✅ Conditions and how to apply
- For a new electricity connection: occupancy permit (permis d'habiter), certificate of compliance (certificat de conformité) or special authorization (for neighborhoods undergoing restructuring)
- Residual-current circuit breakers (disjoncteurs différentiels) must comply with the standards in force
- Industrial water tariff: certificate from the Ministry of Trade and Industry proving that the water is used in manufacturing
- Industrial customers: special discharge agreement (convention de déversement spécial) for sanitation
🧭 Steps
- Pick up the subscription application form from the utility provider or download it through its online agency.
- Complete and sign the application, then gather the supporting documents for your customer category.
- Submit the file to the utility provider for your area.
- Pay the fees (deposit, commissioning fee, subscription contract fee, VAT) and sign the subscription contract.
⚖️ Legal references
Dahir No. 1.16.113 enacting Law No. 36.15 on water; Decision No. 67-350 of 15 July 1967 (electrical installations in buildings); Joint Decision No. 338.20 of 21 January 2020; Order of the Minister of the Interior No. 1025.23 of 3 July 2023 (Decree No. 2.22.141, Law No. 55.19)
Other procedures : Housing, real estate and transport
- Social connection to the drinking water, wastewater sanitation and electricity networks
- Building Repair Permit
- Connecting a standalone building to the drinking water, sanitation and low-voltage electricity networks
- Cancel your drinking water and/or electricity subscription
- Medium-voltage electricity subscription with the distributor
- Obtaining the occupancy permit or the certificate of conformity
- Get a quote to connect an isolated building to water, sewerage and low-voltage electricity
- Get a quote for drinking water and sewerage connection for an industrial unit or a hospital facility
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.