Subdivision Permit (Autorisation de lotir)
Machine-translated — the French version prevails.
An administrative decision that allows a piece of land to be divided into several plots intended for construction (housing, industry, tourism, commerce, crafts). It is issued by the president of the communal council, or by the governor if the project covers several communes.
🏛️ Administration
Commune (Commune), or the Prefecture/Province (préfecture/province) for places of worship projects or projects spanning several communes
💰 CostTax on subdivision operations: between 3% and 5% of the total cost of the development works, at the rate set by the commune's tax decision. Fee paid to the Urban Agency (agence urbaine) for processing the file and issuing its binding opinion: calculated per m² (excluding taxes) of the developed area intended for sale, as set by decision of the Urban Agency.
⏱️ Processing timeAverage of 60 days (30 days is also indicated)
📎 Required documents
- Application signed by the applicant, the architect or an authorized representative (model in Annex No. 5 of Decree No. 2.18.577)
- Identification form signed by the applicant
- Certificate from the National Agency for Land Registry, Cadastre and Mapping (ANCFCC) confirming that the land is registered or that registration is in progress, and that there is no opposition
- ANCFCC plan showing the boundaries of the land to be subdivided
- Location plan of the plot at a scale of 1/2000 or 1/5000
- Topographic plan at a scale of 1/500 (or 1/1000 if the area is over 25 hectares)
- Architectural design documents for the subdivision (plan at a scale of 1/500 or 1/1000)
- Document on the architectural requirements for squares and roads subject to architectural layout easements, and for public spaces
- Infrastructure design plans at a scale of 1/500 or 1/1000
- Longitudinal profiles of the roadways, drainage structures and water pipes
- Standard cross-sections of the roads
- Technical documents on roads and on the water, sewerage, electricity and telecommunications networks
- Plans of the structures at a scale of at least 1/50, where applicable
- Specifications booklet (cahier des charges) setting out the easements burdening the property
- Site logbook (cahier de chantier) in line with the model of the competent authority
- Copies of the contracts signed with the engineers involved in the project
- Copies of the payment receipts for paid services
✅ Conditions and how to apply
- The land must be registered or in the process of being registered, with the opposition period expired and no opposition filed
- The application must be submitted to the Prefecture or Province (préfecture/province) for projects intended for worship or located in two or more communes
⚖️ Legal references
Law No. 25.90 on subdivisions, housing groups and land divisions (Dahir No. 1.92.7 of 17 June 1992); Decree No. 2.92.833 of 12 October 1993; Decree No. 2.18.577 of 12 June 2019; Organic Law No. 113.14 on communes; Law No. 47.06 on local government taxation
Other procedures : Housing, real estate and transport
- Carrying out individual connection works for drinking water, wastewater sanitation and low-voltage electricity
- Get the price list for social connection to water, sanitation and electricity
- Social connection to the drinking water, wastewater sanitation and electricity networks
- Building Repair Permit
- Connecting a standalone building to the drinking water, sanitation and low-voltage electricity networks
- Cancel your drinking water and/or electricity subscription
- Medium-voltage electricity subscription with the distributor
- Obtaining the occupancy permit or the certificate of conformity
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.