This procedure allows you to obtain authorization to convert a filling station into a service station. The application is submitted to the Hydrocarbons Directorate (Direction des hydrocarbures) of the Department of Energy and Mines.

🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Energétique et du Développement DurableDepartment of Energy Transition (Département de la Transition Energétique), Hydrocarbons DirectorateDirection des hydrocarbures
💰 CostFree
⏱️ Processing time60 days

📎 Required documents

  • Application for authorization addressed to the government authority in charge of energy
  • Official map at a scale of 1/50,000 or 1/100,000, or reconnaissance map at a scale of 1/100,000, showing the station to be built and the existing stations within a 50 km radius (rural area project)
  • Location plan at a scale of 1/2000 if the station is close to a built-up area (rural area project)
  • Location plan at a scale of 1/1000 showing the streets and existing stations (urban area project)
  • Plan of the installations approved by the competent authorities
  • Temporary occupation of the public road domain (rural area project)
  • Building permit
  • Land title, lease contract or any document proving the rights to operate the land
  • Certificate of release (mainlevée) of the registrations listed in the property certificate
  • Lambert coordinates of the plot of land
  • Commercial contract linking the liquid petroleum products distribution company to the project operator

⚖️ Legal references

Dahir enacting Law No. 1.72.255 of 18 Muharram 1393 (22 February 1973) on the import, export, refining, packaging, storage and distribution of hydrocarbons, as amended and supplemented; Decree No. 2.72.513 of 3 Rabiul Awwal 1393 (7 April 1973), as amended and supplemented; Circular of the Minister of Energy, Mines, Water and Environment of 21 May 2014; order (or note) governing the required documents, currently being approved.

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →

Official source : Idarati.ma — checked on November 5, 2026