Subscribe to a high-voltage electricity supply contract

Machine-translated — the French version prevails.

Procedure with the National Office of Electricity and Drinking Water (ONEE) - Electricity Branch to sign a contract for the supply of high-voltage electricity. It requires submitting a subscription application together with the required documents.

🏛️ Administration
National Office of Electricity and Drinking WaterOffice National De L’Electricité Et De L’Eau Potable, ONEEElectricity BranchCommercial and Marketing Department
💰 CostThe advance payment on consumption depends on the subscribed power and the applicable tariff. Meter installation fees depend on the file, the duration of the service, the number of agents assigned and the distance between the user and the administration.
⏱️ Processing time7 days

📎 Required documents

  • Subscription application
  • Copy of the trade register (Modèle J)
  • Power of attorney for the representative, with signatures certified by the competent authorities

⚖️ Legal references

Specifications (terms of reference) of the National Office of Electricity and Drinking Water - Electricity Branch (Cahier des charges de l'Office National de l'Électricité et de l'Eau Potable - Branche Électricité); internal procedures

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.