Procedure for obtaining authorization to open a service station or a fuel filling station. The application is submitted to the Hydrocarbons Directorate (Direction des hydrocarbures).

🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Energétique et du Développement DurableDepartment of Energy and MinesDépartement de l'énergie et des minesHydrocarbons DirectorateDirection des hydrocarbures
💰 CostFree
⏱️ Processing time60 days

📎 Required documents

  • Application for authorization addressed to the government authority in charge of energy
  • Official map at a scale of 1/50,000 or 1/100,000, or failing that a reconnaissance map at 1/100,000, showing the location of the planned station and of existing stations within a 50 km radius (project in a rural area)
  • Location plan at a scale of 1/2000 if the station is close to a built-up area (project in a rural area)
  • Location plan at a scale of 1/1000 showing the streets and existing stations (project in an urban area)
  • Descriptive plan of the facilities approved by the competent authorities
  • Temporary occupation of the public road domain (project in a rural area)
  • Building permit
  • Land title, lease contract, or any document proving the rights needed to use the land
  • Certificate of release (mainlevée) of the registrations listed in the property certificate
  • Lambert coordinates of the land plot
  • Commercial contract between the liquid petroleum products distribution company and the project manager

⚖️ Legal references

Dahir issuing Law No. 1.72.255 of 22 February 1973 on the import, export, refining, packaging, storage and distribution of hydrocarbons, as amended and supplemented; Decree No. 2.72.513 of 7 April 1973, as amended and supplemented; Circular of the Minister of Energy, Mines, Water and Environment of 21 May 2014; Ministerial Order No. 491 of 18 October 1976 setting the conditions for opening new stations within urban areas; Order setting out the required documents and supporting papers, currently being approved

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.