Application for authorization to extend a renewable electricity production facility

Machine-translated — the French version prevails.

This procedure allows you to obtain authorization to increase the capacity of a facility that produces electricity from renewable energy sources. The application is submitted to the Directorate of Renewable Energies and Energy Efficiency (Direction des énergies renouvelables et de l'efficacité énergétique).

🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Energétique et du Développement DurableDepartment of Energy Transition (Département de la Transition Energétique)Directorate of Renewable Energies and Energy Efficiency / Direction des énergies renouvelables et de l'efficacité énergétique
💰 CostFree
⏱️ Processing time60 days

📎 Required documents

  • Names of the chairperson and members of the board of directors or supervisory board (public limited companies)
  • Names of the managers and members of the supervisory board (partnerships limited by shares and limited liability companies)
  • Names of all partners (general partnerships and limited liability companies without a supervisory board)
  • Names of the managers authorized to bind the company with their signature
  • Statement that the company is being formed, with the known information about the final owner (if applicable)
  • Name and address of the applicant's agent or representative in Morocco
  • For an individual: profession, nationality, place of residence, and agent or representative in Morocco, if any
  • Precise location of the facility on a topographic map (scale 1/50,000 or other suitable scale), with boundaries given in Lambert or geographic coordinates
  • Renewable energy source, power, production capacity, operating mode, and estimated annual and monthly availability
  • Safety and reliability conditions of the works connecting to the national transmission grid, and their technical characteristics
  • General program and schedule of the works to build or extend the facility
  • Environmental impact report (issues, measures to avoid, reduce or offset impacts, and forecast assessment of greenhouse gas emissions)

⚖️ Legal references

Renewable Energy Law; Law No. 58.15 amending and supplementing Law No. 13.09 on renewable energies; Law regulating the electricity sector and establishing the National Electricity Regulatory Authority; Decree on access to the national medium-voltage electricity grid; Order No. 2657.11 of 20 Chaoual 1432 (19 September 2011)

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →