Get a quote for drinking water and sewerage connection for an industrial unit or a hospital facility

Machine-translated — the French version prevails.

This procedure allows an industrial unit or a hospital facility to receive a quote for connecting to the drinking water and liquid sewerage networks. The application is submitted to the local utility provider (public utility board or delegated management company).

🏛️ Administration
Local AuthoritiesCollectivités TerritorialesConnection to water, sewerage and electricity networks (autonomous public utility boards (régies autonomes) and delegated management companies: Lydec, Redal, Amendis, etc.)
💰 CostAmounts vary depending on the utility provider, the connection distance and the equipment work required. They include: contributions to infrastructure, contributions to flow capacity reinforcement (depending on the case), network extension costs, connection costs (with a road repair tax where applicable), fees and work supervision costs, and VAT. A final invoice is issued after the work, based on the statement of work done (attachement) and the quantities actually carried out, signed by both parties. Rates can be viewed on each provider's portal (e.g. www.lydec.ma, www.redal.ma, www.amendis.ma, www.ramsa.ma).
⏱️ Processing timeAverage time of 14 days; the page also mentions a period of 28 days for the connection price statement.

📎 Required documents

  • Connection application with the contractor's contact details (address, telephone, fax, e-mail)
  • Copy of the National ID card (CNIE) of the manager or contractor
  • Copy of the trade register (registre de commerce) (for companies)
  • Copy of the company's Common Business Identifier (ICE) certificate (for companies)
  • Copy of the articles of association (statuts) (for legal entities)
  • Owner: copy of the proof of ownership (land title, notary's certificate, certificate of ownership or of right of use issued by the authorities)
  • Tenant: owner's authorization and copy of the lease contract
  • Copy of the approved location plan, showing access roads (electronic and paper formats)
  • Copy of the site plan or architectural plan at a scale of 1/500, approved by the commune (Commune), bearing the stamps "NE VARIETUR" and "Favorable opinion" (electronic and paper formats)
  • Copy of the building plans marked NE VARIETUR, approved by the competent authorities (paper and electronic formats)
  • Plan showing the locations of the meter niches (electronic and paper formats)
  • Copy of the building permit
  • Technical sheet indicating the number of meters
  • Summary table (tableau de consistance) signed by the architect (covered areas by level and by type of building, number of meters, etc.)
  • Detailed flow calculation note prepared by a specialized, recognized design office
  • Note on the nature, origin, and physico-chemical and organic characteristics of the discharged water, prepared by a specialized, recognized design office
  • Environmental impact study carried out by a specialized, recognized design office
  • Theoretical values of the discharged substances and metals, with the treatment methods planned before discharge into the public network

✅ Conditions and how to apply

  • The user may be asked to have analyses carried out at their own expense by an approved laboratory.

⚖️ Legal references

Dahir No. 1.16.113 of 6 Dhu'lqa'dah 1437 enacting Law No. 36.15 on water; joint order No. 337.20 of 25 Joumada Al Awwal 1441 (21 January 2020); joint decision No. 338.20 of 25 Joumada Al Awwal 1441 (21 January 2020); order of the Minister of the Interior No. 1025.23 of 14 Dhu al-Hijja 1444 (3 July 2023); decisions of the boards of directors of the public utility boards (régies); delegated management contracts; provider specifications (cahiers des charges).

Other procedures : Housing, real estate and transport

All procedures: Housing, real estate and transport →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.