Get a quote to connect an isolated building to water, sewerage and low-voltage electricity

Machine-translated — the French version prevails.

This procedure lets you get a quote from your local utility provider for the individual connection of an isolated building to the drinking water, wastewater sewerage and low-voltage electricity networks. The application is submitted to the public utility board (régie) or the delegated management company that serves your area.

🏛️ Administration
Local AuthoritiesCollectivités TerritorialesConnection to water, sewerage and electricity networkspublic utility boards and delegated management companies: RAMSA, RAK, Amendis, RADEEJ, RADEET, Redal, RADEEMA, RADEEC, RADEEL, RADEETA, RADEEF, RADEM, RADEEO, RADEES, Lydec, etc.
💰 CostAmounts vary depending on the utility provider, the connection distance and the infrastructure work required. They include: contributions to infrastructure; contributions to increased electrical power or reinforced water flow; connection/hook-up/inspection fees and a road resurfacing tax where applicable; network extension costs where applicable; fees and charges for supervising the works; VAT. A final invoice is issued at the end of the works based on the quantities actually carried out. Rates can be viewed on the utility provider's portal.
⏱️ Processing time10 days for the price statement for the individual connection of an isolated building.

📎 Required documents

  • Connection application with the contractor's contact details (address, telephone, fax, email)
  • Copy of the National ID card (CIN) of the manager or contractor
  • Copy of the commercial register (Registre de commerce) extract (for companies)
  • Copy of the Common Company Identifier (ICE) certificate (for companies)
  • Copy of the articles of association (for legal entities)
  • Owner: copy of the proof of ownership (land title, notary's certificate, moulkia, certificate of ownership or of right of disposal)
  • Tenant: the owner's authorization and a copy of the lease agreement
  • Copy of the approved location plan, showing access roads (electronic and paper formats)
  • Copy of the site plan or architectural plan at a scale of 1/500, approved by the commune (Commune), stamped "NE VARIETUR" and "Favorable opinion" (electronic and paper formats)
  • Copy of the NE VARIETUR building plans approved by the commune (Commune) (paper and electronic formats)
  • Plan showing the outlets of the building's meter niches (electronic and paper formats)
  • Copy of the building permit
  • Technical sheet stating the number of meters
  • Diagram of the electrical distribution riser approved by the utility provider
  • Table of building areas and units signed by the architect (covered areas per level and per building, number of meters, ground-floor area used for commercial purposes)
  • Deed of free transfer of the plot to the utility provider, if a MV/LV transformer substation is needed

✅ Conditions and how to apply

  • The owner, or the tenant (with the owner's authorization), submits the application to the utility provider for their area
  • If a MV/LV (medium voltage/low voltage) transformer substation is needed, the plot of land must be transferred free of charge to the utility provider

🧭 Steps

  1. Gather the documents for your file.
  2. Submit the connection application with the documents to the utility provider (public utility board or delegated management company) for your area.
  3. Receive the connection quote prepared by the utility provider.

⚖️ Legal references

Dahir No. 1.92.7 of 17 June 1992 (Law 25.90 on subdivisions, housing groups and land division); Dahir No. 1.92.31 of 17 June 1992 (Law 12.90 on urban planning); Decision No. 67-350 of 15 July 1967; Joint Order No. 337.20 of 21 January 2020; Joint Decision No. 338.20; Decree No. 2-18-577 (general construction regulation); Order of the Minister of the Interior No. 1025.23 of 3 July 2023; decisions of the boards of directors of the public utility boards, delegated management contracts and the utility provider's specifications (cahiers des charges)

Other procedures : Housing, real estate and transport

All procedures: Housing, real estate and transport →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.