Get a quote to connect an isolated building to water, sewerage and low-voltage electricity
This procedure lets you get a quote from your local utility provider for the individual connection of an isolated building to the drinking water, wastewater sewerage and low-voltage electricity networks. The application is submitted to the public utility board (régie) or the delegated management company that serves your area.
📎 Required documents
- Connection application with the contractor's contact details (address, telephone, fax, email)
- Copy of the National ID card (CIN) of the manager or contractor
- Copy of the commercial register (Registre de commerce) extract (for companies)
- Copy of the Common Company Identifier (ICE) certificate (for companies)
- Copy of the articles of association (for legal entities)
- Owner: copy of the proof of ownership (land title, notary's certificate, moulkia, certificate of ownership or of right of disposal)
- Tenant: the owner's authorization and a copy of the lease agreement
- Copy of the approved location plan, showing access roads (electronic and paper formats)
- Copy of the site plan or architectural plan at a scale of 1/500, approved by the commune (Commune), stamped "NE VARIETUR" and "Favorable opinion" (electronic and paper formats)
- Copy of the NE VARIETUR building plans approved by the commune (Commune) (paper and electronic formats)
- Plan showing the outlets of the building's meter niches (electronic and paper formats)
- Copy of the building permit
- Technical sheet stating the number of meters
- Diagram of the electrical distribution riser approved by the utility provider
- Table of building areas and units signed by the architect (covered areas per level and per building, number of meters, ground-floor area used for commercial purposes)
- Deed of free transfer of the plot to the utility provider, if a MV/LV transformer substation is needed
✅ Conditions and how to apply
- The owner, or the tenant (with the owner's authorization), submits the application to the utility provider for their area
- If a MV/LV (medium voltage/low voltage) transformer substation is needed, the plot of land must be transferred free of charge to the utility provider
🧭 Steps
- Gather the documents for your file.
- Submit the connection application with the documents to the utility provider (public utility board or delegated management company) for your area.
- Receive the connection quote prepared by the utility provider.
⚖️ Legal references
Dahir No. 1.92.7 of 17 June 1992 (Law 25.90 on subdivisions, housing groups and land division); Dahir No. 1.92.31 of 17 June 1992 (Law 12.90 on urban planning); Decision No. 67-350 of 15 July 1967; Joint Order No. 337.20 of 21 January 2020; Joint Decision No. 338.20; Decree No. 2-18-577 (general construction regulation); Order of the Minister of the Interior No. 1025.23 of 3 July 2023; decisions of the boards of directors of the public utility boards, delegated management contracts and the utility provider's specifications (cahiers des charges)
Other procedures : Housing, real estate and transport
- Authorization to subdivide a real estate property
- Obtain a Quote for Supplying Water, Sanitation and Electricity to a Subdivision or Housing Group
- Authorization to create a housing group
- Connecting a Subdivision or Housing Group to the Drinking Water, Sewerage and Electricity Networks
- Carrying out individual connection works for drinking water, wastewater sanitation and low-voltage electricity
- Get the price list for social connection to water, sanitation and electricity
- Social connection to the drinking water, wastewater sanitation and electricity networks
- Building Repair Permit