Authorization for a hazardous waste treatment facility
Machine-translated — the French version prevails.
This procedure allows you to obtain authorization to operate a facility specialized in treating hazardous waste. The 60-day period includes the site visit and the preparation of the report.
🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Energétique et du Développement DurableSustainable Development Department (Département du Développement Durable)Environment Department
💰 CostFree
⏱️ Processing time60 days, including the site visit and the preparation of the report
📎 Required documents
- Application form for hazardous waste treatment authorization
- Site layout plan showing the buildings and installations
- Site plan showing how the different areas are used (stairs, platforms, emergency exits)
- Description of the facility, its structure and how it operates
- Description of treatment methods and equipment: treatment capacity and services provided
- Description of treatment methods and equipment: type of devices and machines used
- Description of treatment methods and equipment: operating hours, number of shifts, staff qualifications and training
- Self-monitoring plan for the management of the facility and the means to implement it
- Copy of the environmental acceptability decision
- Copy of the financial guarantee provided for in Article 58 of Law No. 28-00
⚖️ Legal references
Law No. 28-00 on waste management and disposal; Decree No. 2-07-253 on the classification of waste and the definition of hazardous waste; Decree No. 2-14-85 on hazardous waste management
Other procedures : Energy, minerals and environment
- Renewal of the definitive authorization to operate a renewable electricity production facility
- Authorization to Use Additives in Fuels
- Obtaining a hydrocarbon exploration permit
- Authorization to operate new storage or filling facilities in an LPG filling center
- Authorization to build hydro-agricultural structures (ORMVA du Tadla)
- Provisional authorization to build a renewable energy electricity production facility
- Authorization to Operate a Bulk Liquefied Petroleum Gas Storage Depot
- Application for authorization to extend a renewable electricity production facility
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.