Authorization to commission a factory producing civil explosives and blasting accessories
Machine-translated — the French version prevails.
Procedure to obtain the decision authorizing the commissioning of a factory that produces explosives and blasting accessories for civil use. The application is submitted to the Directorate of Risk Control and Prevention (Direction du contrôle et de la prévention des risques).
🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Energétique et du Développement DurableEnergy Transition Department (Département de la Transition Energétique) (Directorate of Risk Control and PreventionDirection du contrôle et de la prévention des risques)
💰 CostFree
⏱️ Processing time60 days
📎 Required documents
- Application for authorization to commission the factory, signed and stamped by the applicant's legal representative
⚖️ Legal references
Dahir of 18 Joumada I 1332 (14 April 1914) on the organization of the explosives industry, as amended and supplemented; Joint circular of the Minister of the Interior and the Minister of Energy and Mines No. 4546 of 21 July 2006 on strengthening security measures concerning explosives
Other procedures : Energy, minerals and environment
- Authorization to operate a storage depot for liquefied petroleum gas cylinders
- Obtaining an additional period (1st or 2nd) for a hydrocarbon exploration permit
- Obtain approval for butane and propane gas cylinder caps and valves
- Authorization to set up a liquefied petroleum gas (LPG) filling center
- Terminate your electricity contract
- Obtain an estimate for the work to connect to the low-voltage electricity network
- Administrative certificate for billing shared domestic water and electricity meters
- Connection to the High-Voltage Electricity Grid
Official source : Idarati.ma — checked on November 5, 2026