Rerouting a High-Voltage Power Line
Machine-translated — the French version prevails.
This procedure allows you to enter into an agreement with ONEE (electricity branch) to change the route of a high-voltage power line. The request is submitted to the Commercial and Marketing Department.
🏛️ Administration
National Office of Electricity and Drinking WaterOffice National de l'Électricité et de l'Eau Potable, ONEEElectricity BranchCommercial and Marketing Department
💰 Cost5000 dirhams; 20% of the cost of the works as fees; other charges
⏱️ Processing time30 days
📎 Required documents
- Request to reroute a high-voltage power line
- Copy of the commercial register (Model J)
- Power of attorney for the representative, with signatures certified by the competent authorities
- Plan
- Certificate of ownership
- Authorizations to use the property for installing the network, with third-party signatures certified by the competent authorities
⚖️ Legal references
Specifications of the National Office of Electricity and Drinking Water - Electricity Sector (Cahier des charges de l'Office National de l'Électricité et de l'Eau Potable - Secteur de l'Électricité); Internal procedures
Other procedures : Energy, minerals and environment
- Declaration of completion of a renewable energy production installation (electrical or thermal), including renewal
- Merger of mining exploration permits
- Authorization to convert a filling station into a service station
- Declaration of a Steam Appliance
- Authorization to Use Explosives and Blasting Accessories at a Restricted Site
- Renewal of the Authorization to Exploit Mining Waste and Spoil Heaps
- Assessment of Works to Relocate Power Lines
- Authorization for the transit of waste through Moroccan ports
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.