Assessment of Works to Relocate Power Lines
A service of the National Office of Electricity and Drinking Water (ONEE) - Electricity Branch. It carries out a technical study and estimates the work needed to relocate power lines. You submit the request to the provincial directorates, the general administration, the central directorate or the service agencies.
📎 Required documents
- Request for works carried out on behalf of third parties
- Copy of the National ID card (CNIE)
- Copy of the residence card or passport
- Copy of the manager's National ID card (CNIE)
- Copy of the trade register (Model J)
- Certificate of the company's common identifier (Identifiant Commun de l'Entreprise, ICE)
- Authorization from the delegate, for government administrations
- Copy of the document proving the signing authority granted to the delegate, with the third parties' signatures certified by the competent authorities
- Minutes of the general assembly
- Articles of association
- Permissions for power lines to cross land, if third-party land is used, with the signatures of the persons concerned certified by the owners of the land concerned
⚖️ Legal references
Specifications of the National Office of Electricity and Drinking Water - Electricity Branch (Cahier des charges de l'Office National de l'Électricité et de l'Eau Potable - Branche Électricité) / Procedure for managing works on third-party land (Procédure de gestion des travaux sur terrains de tiers); internal procedures
Other procedures : Energy, minerals and environment
- Obtaining a decree granting a hydrocarbon exploitation concession
- Authorization to extract and collect mineralogical specimens, fossils and meteorites
- Getting hydraulic test certificates for pressure equipment endorsed
- Obtain a certificate for transporting mining samples for chemical analysis (in Morocco or abroad)
- Certificate for shipping mineral and fossil samples with no commercial value for study purposes
- Obtaining a certificate of absence of radioactive contamination (environment, food, water)
- Obtaining an extension of a hydrocarbon reconnaissance authorization
- Carry out the mandatory energy audit