Obtaining approval for the integrated flow limiter in the valve of 12 kg butane and 34 kg propane gas cylinders
Procedure for obtaining approval for the flow limiter integrated into the valve of 12 kg butane and 34 kg propane gas cylinders. The application is addressed to the Minister, together with a technical and administrative file.
📎 Required documents
- Signed and stamped application addressed to the Minister
- Copy of the company's articles of association and its trade register (registre de commerce) extract
- Copy of the powers granted to the person signing the application
- Identification sheet of the valve containing the integrated flow limiter
- Technical drawing of the integrated flow limiter
- Certificate of the tests carried out on the integrated flow limiter by an inspection body approved by the Department of Energy and Mines (Département de l'Énergie et des Mines)
- Copy of the patent filing certificate issued by the Moroccan Industrial and Commercial Property Office (Office marocain de la propriété industrielle et commerciale)
- Certificate of compliance of the valve with mandatory Moroccan standards
- Leak-tightness inspection certificate issued by an inspection body approved by the Department of Energy and Mines
⚖️ Legal references
Dahir of 12 January 1955 (18 Joumada I 1374) establishing a regime for compressed gas appliances, as amended and supplemented; Decision of the Director of Industrial Production and Mines of 14 January 1955 setting certain terms of application of the Dahir of 12 January 1955, as amended and supplemented; Decision of the Director of Industrial Production and Mines of 29 December 1953 on certain storage containers for liquid hydrocarbon products, as amended and supplemented
Other procedures : Energy, minerals and environment
- Authorization to operate a lubricating oil processing and packaging plant
- Obtaining an authorization to exploit mining waste and spoil heaps
- Terminate a high-voltage electricity contract
- Declaration of completion of a renewable energy production installation (electrical or thermal), including renewal
- Authorization to convert a filling station into a service station
- Merger of mining exploration permits
- Declaration of a Steam Appliance
- Authorization to Use Explosives and Blasting Accessories at a Restricted Site
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.