Authorization to operate a lubricating oil processing and packaging plant
Machine-translated — the French version prevails.
This procedure allows you to obtain authorization to operate a plant that processes and packages lubricating oils. It is free of charge and takes 30 days on average.
🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Energétique et du Développement DurableEnergy Transition Department (Département de la Transition Energétique) (Hydrocarbons Directorate (Direction des hydrocarbures))
💰 CostFree
⏱️ Processing time30 days
📎 Required documents
- Certificate from an authorized body attesting that the plant's electrical installations comply with the legislation in force
- Certificate from an authorized body attesting that the plant's safety and fire-fighting equipment complies with the legislation in force
⚖️ Legal references
Dahir bearing law No. 1-72-255 of 18 Moharram 1393 (22 February 1973); Decree No. 2-72-513; Order No. 68-455 of 2 August 1968; Joint Order No. 08-1932 of 20 October 2008
Other procedures : Energy, minerals and environment
- Authorization to collect and transport hazardous waste
- Obtaining a Mining Exploration Authorization
- Authorization to transfer all or part of the shares in a hydrocarbon exploitation concession
- Obtaining a Hydrocarbon Reconnaissance Authorization
- Authorization to commission a factory producing civil explosives and blasting accessories
- Certificate of operation of a premises, depot or factory for the explosives control card
- Subscribing to a medium-voltage electricity contract
- Amendment of a High-Voltage Electricity Supply Contract
Official source : Idarati.ma — checked on November 5, 2026