Obtaining a study and cost estimate for the electrification works of a housing development

Machine-translated — the French version prevails.

The developer asks the National Office of Electricity and Drinking Water - Electricity Branch (ONEE - Branche électricité) for a technical study and a cost estimate for the works needed to supply electricity to a residential, industrial or service-sector housing development.

🏛️ Administration
National Office of Electricity and Drinking WaterElectricity Branch (Office National de l'Électricité et de l'Eau PotableBranche électricité)
💰 Cost2000 dirhams
⏱️ Processing time25 days

📎 Required documents

  • Application submitted by the developer
  • Copy of the national ID card (CIN)
  • Copy of the residence permit or passport
  • Copy of the manager's national ID card (CIN)
  • Copy of the commercial register extract (model J) (registre du commerce)
  • Company common identifier certificate (identifiant commun de l'entreprise)
  • Authorization from the delegate for administrations
  • Minutes of the general assembly
  • Articles of association (statuts)
  • Copy of the signature delegation document, with signatures certified by the competent authorities
  • Copy of the specifications booklet (cahier des charges) approved by the competent departments
  • Copy of the plans of the housing development or buildings approved by the competent departments
  • Copy of the agreement between the real estate developer and the State for social housing
  • Authorizations for power lines to cross third-party land, with the owners' certified signatures

⚖️ Legal references

Decree No. 533-73-2 on the specifications of the National Office of Electricity and Drinking Water - Electricity Branch (Décret n° 533-73-2 portant cahier des charges de l'Office National de l'Électricité et de l'Eau Potable - Branche Électricité); internal procedures

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.