Obtaining a study and cost estimate for the electrification works of a housing development
Machine-translated — the French version prevails.
The developer asks the National Office of Electricity and Drinking Water - Electricity Branch (ONEE - Branche électricité) for a technical study and a cost estimate for the works needed to supply electricity to a residential, industrial or service-sector housing development.
🏛️ Administration
National Office of Electricity and Drinking WaterElectricity Branch (Office National de l'Électricité et de l'Eau PotableBranche électricité)
💰 Cost2000 dirhams
⏱️ Processing time25 days
📎 Required documents
- Application submitted by the developer
- Copy of the national ID card (CIN)
- Copy of the residence permit or passport
- Copy of the manager's national ID card (CIN)
- Copy of the commercial register extract (model J) (registre du commerce)
- Company common identifier certificate (identifiant commun de l'entreprise)
- Authorization from the delegate for administrations
- Minutes of the general assembly
- Articles of association (statuts)
- Copy of the signature delegation document, with signatures certified by the competent authorities
- Copy of the specifications booklet (cahier des charges) approved by the competent departments
- Copy of the plans of the housing development or buildings approved by the competent departments
- Copy of the agreement between the real estate developer and the State for social housing
- Authorizations for power lines to cross third-party land, with the owners' certified signatures
⚖️ Legal references
Decree No. 533-73-2 on the specifications of the National Office of Electricity and Drinking Water - Electricity Branch (Décret n° 533-73-2 portant cahier des charges de l'Office National de l'Électricité et de l'Eau Potable - Branche Électricité); internal procedures
Other procedures : Energy, minerals and environment
- Administrative certificate for billing shared domestic water and electricity meters
- Connection to the High-Voltage Electricity Grid
- Authorization to transfer part or all of the interests in a hydrocarbon exploration permit
- Authorization to use explosives and blasting accessories for immediate on-site use
- Renewal of a Mining Exploration Authorization
- Authorization to operate a depot for civil-use explosives and firing accessories
- Authorization to Relocate a Service Station or a Filling Station
- Renewal of the authorization to use explosives and blasting accessories (immediate use on site)
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.