Obtaining a certificate of conformity with standards for energy efficiency and renewable energy equipment
Machine-translated — the French version prevails.
This procedure lets you have solar water heaters or photovoltaic solar panels checked through trials and tests, to confirm they meet Moroccan quality standards. The Moroccan Agency for Energy Efficiency (Agence marocaine pour l'efficacité énergétique) issues the certificate.
🏛️ Administration
Moroccan Agency for Energy EfficiencyAgence marocaine pour l'efficacité énergétique
💰 CostFees for trials, tests and/or audits: 25,000 DH for solar water heaters and 12,000 DH for photovoltaic solar panels. 75% of the fees are paid in advance and the balance before the certificate is issued.
⏱️ Processing time60 days
📎 Required documents
- Application for a certificate of conformity for energy equipment and appliances
- Technical sheet or technical file of the equipment and appliances concerned
- Contract for the tests and/or audits of the energy equipment and appliances
- Receipt showing payment of the fees for the tests and/or audit operations
⚖️ Legal references
Law No. 16-09 on the Moroccan Agency for Energy Efficiency (Agence Marocaine de l'Efficacité Énergétique); Decision of the Director General of the Agency No. 216 setting the documents required to issue certificates of conformity; Decision of the Director General of the Agency No. 193 setting the fee schedule
Other procedures : Energy, minerals and environment
- Administrative authorization to carry out the filling of liquefied petroleum gas (LPG) cylinders
- Obtaining the final authorization to operate a renewable energy electricity production facility
- Administrative authorization to take back liquefied petroleum gas (LPG) at the refinery
- Authorization to operate a lubricating oil processing and packaging plant
- Obtaining an authorization to exploit mining waste and spoil heaps
- Terminate a high-voltage electricity contract
- Declaration of completion of a renewable energy production installation (electrical or thermal), including renewal
- Merger of mining exploration permits
Official source : Idarati.ma — checked on November 5, 2026