Obtain an estimate for medium-voltage electricity grid connection works
Machine-translated — the French version prevails.
The National Office of Electricity and Drinking Water (ONEE) carries out a technical study and estimates the cost of the work needed to supply a user with electricity through the medium-voltage grid.
🏛️ Administration
National Office of Electricity and Drinking WaterONEEElectricity Branch (Office National de l'Électricité et de l'Eau PotableBranche électricité)
💰 Cost1000 dirhams (MAD)
⏱️ Processing time20 days
📎 Required documents
- Application for connection to the medium-voltage electricity grid, stating the required electrical power
- Copy of the National ID card (CNIE)
- Copy of the residence permit or passport
- Copy of the manager's National ID card (CNIE)
- Copy of the trade register extract (Model J) (Registre de commerce, Modèle J)
- Certificate of the company's Common Business Identifier (Identifiant commun de l'entreprise, ICE)
- Authorization of the representative, for government administrations
- Minutes of the general meeting (Procès-verbal de l'assemblée générale)
- Articles of association (Statuts)
- Copy of the document proving the delegation of signature, certified by the competent authorities, for the person authorized to sign on behalf of third parties
- Copy of the project plan approved by the competent departments
- Operating permit (alternative)
- Business activity permit (alternative)
- Rights-of-way authorizations for power lines, approved by the owners, if third-party land is used
⚖️ Legal references
Decree No. 2-73-533 establishing the specifications (terms of reference) of the National Office of Electricity and Drinking Water - Electricity Branch (Décret n° 2-73-533) / Procedure for managing third-party works; internal procedures
Other procedures : Energy, minerals and environment
- Certificate of exemption from electricity connection fees for a farm
- Renewal of the definitive authorization to operate a renewable electricity production facility
- Authorization to Use Additives in Fuels
- Obtaining a hydrocarbon exploration permit
- Authorization to operate new storage or filling facilities in an LPG filling center
- Authorization to build hydro-agricultural structures (ORMVA du Tadla)
- Provisional authorization to build a renewable energy electricity production facility
- Authorization to Operate a Bulk Liquefied Petroleum Gas Storage Depot
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.