Procedure allowing a user to be connected to electricity through the low-voltage network, when the connection requires neither an extension nor a reinforcement of the existing network.

🏛️ Administration
National Office of Electricity and Drinking WaterOffice National de l'Électricité et de l'Eau PotableElectricity Branch
💰 CostThe flat-rate connection cost depends on the type of meter. The cost of conductors, where applicable, depends on the type of connection. The contribution to a network financed by third parties depends on the length of the line the user benefits from or on the power requested.
⏱️ Processing time12 days in urban areas and 14 days in rural areas

📎 Required documents

  • Connection request
  • Copy of the National ID card (CIN)
  • Copy of the residence card or passport
  • Copy of the occupancy permit (permis d'habiter), the certificate of conformity, or the connection authorization (unstructured areas)
  • Warranty certificate for the residual current circuit breaker
  • Authorization from co-owners in case of co-ownership (certified signatures)
  • Copy of the manager's National ID card (CIN)
  • Copy of the commercial register extract (model J)
  • Certificate of the company's common identifier (Identifiant Commun de l'Entreprise)
  • Power of attorney of the representative (certified signatures)
  • Authorization of the delegate for government administrations
  • Undertaking in case of connection from a transformer belonging to another customer (certified signatures)
  • Inheritance deed, with power of attorney from the other heirs or an undertaking by the user authorizing the Office to terminate the contract if an heir objects
  • Judgment issued by the competent court
  • Minutes of the general assembly
  • Articles of association (statutes)
  • Right-of-way authorization from the owner if their property is used for the connection (certified signatures)
  • Waiver of financial rights in case of connection to a network financed by third parties (certified signatures)
  • Connection, building, or business activity authorization for a temporary connection
  • Certificate allowing the user to benefit from the billing system for shared water and electricity meters for domestic use

⚖️ Legal references

Specifications (Cahier des charges) of the National Office of Electricity and Drinking Water - Electricity Sector; Decision of the Minister of Public Works and Transport to legalize and electrify electrical installations in buildings; Joint ministerial circular on how to benefit from the new billing system for shared water and electricity meters; Circular of the Minister of the Interior defining the procedure for issuing the administrative certificate required to benefit from the new billing system for shared meters; Ministerial order on the classification of residual current circuit breakers; Internal procedures

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.