Connection to the low-voltage electricity network without network extension or reinforcement
Procedure allowing a user to be connected to electricity through the low-voltage network, when the connection requires neither an extension nor a reinforcement of the existing network.
📎 Required documents
- Connection request
- Copy of the National ID card (CIN)
- Copy of the residence card or passport
- Copy of the occupancy permit (permis d'habiter), the certificate of conformity, or the connection authorization (unstructured areas)
- Warranty certificate for the residual current circuit breaker
- Authorization from co-owners in case of co-ownership (certified signatures)
- Copy of the manager's National ID card (CIN)
- Copy of the commercial register extract (model J)
- Certificate of the company's common identifier (Identifiant Commun de l'Entreprise)
- Power of attorney of the representative (certified signatures)
- Authorization of the delegate for government administrations
- Undertaking in case of connection from a transformer belonging to another customer (certified signatures)
- Inheritance deed, with power of attorney from the other heirs or an undertaking by the user authorizing the Office to terminate the contract if an heir objects
- Judgment issued by the competent court
- Minutes of the general assembly
- Articles of association (statutes)
- Right-of-way authorization from the owner if their property is used for the connection (certified signatures)
- Waiver of financial rights in case of connection to a network financed by third parties (certified signatures)
- Connection, building, or business activity authorization for a temporary connection
- Certificate allowing the user to benefit from the billing system for shared water and electricity meters for domestic use
⚖️ Legal references
Specifications (Cahier des charges) of the National Office of Electricity and Drinking Water - Electricity Sector; Decision of the Minister of Public Works and Transport to legalize and electrify electrical installations in buildings; Joint ministerial circular on how to benefit from the new billing system for shared water and electricity meters; Circular of the Minister of the Interior defining the procedure for issuing the administrative certificate required to benefit from the new billing system for shared meters; Ministerial order on the classification of residual current circuit breakers; Internal procedures
Other procedures : Energy, minerals and environment
- Certificate for Agricultural Electricity Connection
- Subscribe to a low-voltage electricity contract
- Obtaining an insurance certificate for civil liability for bunker oil pollution damage
- Obtain a receipt for the deposit of a meteorite (sample and technical sheet) for customs declaration
- Authorization to Operate an Extension of a Bulk LPG Storage Depot
- Authorization to Create New Storage or Filling Facilities in a Liquefied Petroleum Gas (LPG) Filling Center
- Technical opinion for exporting mineral and fossil samples
- Authorization to Extend a Bulk Liquefied Petroleum Gas Storage Depot
Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.