Authorization to Create New Storage or Filling Facilities in a Liquefied Petroleum Gas (LPG) Filling Center

Machine-translated — the French version prevails.

This procedure allows you to obtain the authorization decision to create new storage or filling facilities in a liquefied petroleum gas (LPG) filling center. The application is submitted to the Directorate of Hydrocarbons (Direction des hydrocarbures).

🏛️ Administration
Ministry of Energy Transition and Sustainable DevelopmentMinistère de la Transition Énergétique et du Développement DurableEnergy Transition Department (Département de la Transition Énergétique), Directorate of HydrocarbonsDirection des hydrocarbures
💰 CostFree
⏱️ Processing time30 days

📎 Required documents

  • Application signed by the investor, specifying the list of documents submitted
  • Company articles of association (statuts de la société)
  • Technical and economic study (filling and storage capacities, butane reception facilities, investments and financing, jobs created)
  • Location plan at a scale of 1/1000 of the project site (location, surface area, etc.)
  • Note indicating the center's supply point and the LPG reception facilities planned in the nearest port
  • Copy of the authorization for unhealthy, inconvenient or dangerous establishments (établissements insalubres, incommodes ou dangereux)
  • Copy of the land title deed or the land lease contract
  • Copy of the building permit
  • Plans and detailed description of the planned facilities (filling circuits, storage tanks, LPG pumping station, washing and paint maintenance of containers, test benches, sealing equipment, firefighting means)

⚖️ Legal references

Dahir bearing Law No. 1.72.255 of 22 February 1973 on the import, export, refining, packaging, storage and distribution of hydrocarbons, in particular its Chapter II; Decree No. 2-72-513 of 7 April 1973, in particular its Article 16; Joint Decision No. 1263-91 of 9 Chaoual 1413 (1 April 1993) approving the general regulation on safety rules applicable to LPG filling centers and warehouses; Decision setting the documents and items required at the approval stage

Other procedures : Energy, minerals and environment

All procedures: Energy, minerals and environment →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.