Building permit for an investment project (outside free zones)

Machine-translated — the French version prevails.

Procedure to obtain a building permit to carry out an investment project, in compliance with the regulations in force. The application is submitted to the provincial investment center, and the permit is issued by the local authority (collectivité territoriale) concerned.

🏛️ Administration
Ministry of the InteriorMinistère de l'IntérieurRegional Investment Centers (Centres Régionaux d'Investissement) (submission: Provincial Investment Center (Centre provincial d'investissement); issuance: local authority (collectivité territoriale) of the project location)
💰 CostTax on construction operations, paid in a single payment when the permit is issued, based on the covered area: from 20 DH/m² (multi-unit residential buildings, real estate developments, or industrial, commercial, professional or administrative buildings); from 25 DH/m² (individual housing); from 10 DH/m² (housing groups and housing units under the program to fight unsanitary housing). Minimum of 1000 DH. Projections over the public domain are counted double. Tax for temporary occupation of the communal public domain, per m² occupied. Fee for the urban agency (agence urbaine), set per m² excluding tax according to the built area.
⏱️ Processing time30 days

📎 Required documents

  • Application signed by the user, the engineer who designed the project, or any authorized person
  • Certificate of ownership of the plot, of the existing building, or of the building to be modified, or an equivalent document
  • Plan from the National Agency for Land Registry, Cadastre and Mapping (ANCFCC) showing the boundaries of the land (registered property), or a topographic plan (unregistered property)
  • Location plan of the plot (orientation, access roads, landmarks)
  • Construction plan of all levels, terraces and roofs, at a scale of at least 1/100
  • Previously authorized plan and previous subdivision permit or authorization (in case of modification or renewal)
  • Architect's contract when using an architect is mandatory
  • Technical note on compliance with fire and panic prevention rules
  • Architect's technical note on the energy efficiency of the building
  • Additional documents
  • Identification form signed by the applicant
  • Technical file for connection to the public telecommunications network (for a building)
  • Technical plans by specialized engineers on structure and stability
  • Copy of the alignment certificate (if the construction is adjacent to a public road)
  • Site logbook (cahier de chantier)
  • Copy of payment receipts for paid services

⚖️ Legal references

Law No. 47.18 (Dahir No. 1.19.18 of 13 February 2019); Dahir No. 1.15.85 of 07 July 2015 (Organic Law No. 113.14); Law No. 47-06; Law No. 12-90 (Dahir No. 1-95-1 of 26 January 1995); Law No. 25-90; Decree No. 2.18.577 of 12 June 2019; Decree No. 2-92-832 of 14 October 1993; Joint Order No. 20-337

Other procedures : Construction, housing and real estate

All procedures: Construction, housing and real estate →

Official source : Idarati.ma — checked on November 5, 2026
For information only. Check with the administration concerned before proceeding.